TIME AND WORK
If A can finish a work in X time and B can finish the same work in Y time then both of them together can finish that work in (X*Y)/ (X+Y) time.
If A can finish a work in X time and A & B together can finish the same work in S time then B can finish that work in (XS)/(X-S) time.
If A can finish a work in X time and B in Y time and C in Z time then all of them working together will finish the work in (XYZ)/ (XY +YZ +XZ) time
If A can finish a work in X time and B in Y time and A, B & C together in S time then
· C can finish that work alone in (XYS)/ (XY-SX-SY)
· B+C can finish in (SX)/(X-S); and
· A+C can finish in (SY)/(Y-S)